Markup vs. Margin for Contractors: The Math That Decides If You Make Money

Short answer
Markup is the percent you add on top of your cost; margin is the percent of the final price you keep. They are not the same number: a 20% markup only gives you about a 16.7% margin, and to get a 20% margin you need a 25% markup. Decide which one you're targeting and do the math on every estimate.
The two formulas
- Markup = (price − cost) ÷ cost.
- Margin = (price − cost) ÷ price.
- To get a target margin: price = cost ÷ (1 − margin).
Example (numbers for illustration only)
Say a job costs you $10,000 in materials, labor and overhead.
- With a 20% markup: price = $12,000. Profit = $2,000. Margin = 2,000 ÷ 12,000 = 16.7%.
- For a 20% margin: price = 10,000 ÷ 0.80 = $12,500. Profit = $2,500.
- The difference on this one job is $500, just from mixing up the two words.
Quick conversion table
- 10% markup → 9.1% margin
- 15% markup → 13% margin
- 20% markup → 16.7% margin
- 25% markup → 20% margin
- 33% markup → 25% margin
- 50% markup → 33% margin
Overhead is not profit
Your cost must include overhead: truck, fuel, insurance, phone, tools, software, office time. If you add 20% "for profit" but that 20% is really paying your overhead, your real profit is close to zero. Figure out overhead first, add it to the cost, then add profit on top.
Reselling sub work
When you hire a sub and resell their price to your customer, you're taking on the risk, the scheduling and the warranty. Add your markup to their price instead of passing it through at cost.
How Andamia helps
In Andamia you set your default markup once and the estimate adds it to materials, labor and subcontractor prices. On each job you can compare what you estimated against the real cost of receipts and crew pay, so you know what you actually kept.
Common questions
Is 20% markup the same as 20% margin?
No. A 20% markup gives about a 16.7% margin. To keep 20% of the price, you need a 25% markup.
What markup should a contractor use?
It depends on your trade, area, overhead and risk. The key is to include overhead in your cost first and then add profit on top, and check your real numbers after each job.
How do I calculate price from a target margin?
Divide your total cost by (1 − margin). For a 25% margin on a $8,000 cost: 8,000 ÷ 0.75 = $10,667.